Contract facts
FederalAE DESIGN STUDY TO REPLACE MCCANDLESS SWITCHING STATION. is a federal award for Navfac Southwest held by Ma Engineers Jv. Estimated value $1.4M ($1.4M obligated). Current period of performance ends Oct 22, 2023. Place of performance: SAN DIEGO CA.
AE DESIGN STUDY TO REPLACE MCCANDLESS SWITCHING STATION.
Recompete timing
PublicCurrent PoP ended Oct 22, 2023 (1034 days ago). The usual 12–18 month agency planning window is closed — recompete action looks late / overdue relative to a normal cycle. Watch for bridge orders, follow-ons, or a new solicitation.
Incumbent footprint
Public recordMa Engineers Jv — $8.0M obligated across 18 awards (firm-wide, all agencies).
Related awards
Same parent · incumbentQuery this award live in SCOUT via MCP — personalized scoring, watchlists, and capture workflow across the corpus. Learn about SCOUT MCP →
Frequently asked questions
What is contract N6247322F4883?
N6247322F4883 (AE DESIGN STUDY to replace mccandless) is a Navfac Southwest award with a potential value of $1.4M, currently held by Ma Engineers Jv. Figures are USASpending-sourced public-record facts plus SCOUT recompete analysis.
What is N62473-22-F-4883?
N62473-22-F-4883 is the dashed form of PIID N6247322F4883 (AE DESIGN STUDY to replace mccandless), held by Ma Engineers Jv. Same award — SCOUT canonicalizes compact, dashed, and parent-child identifiers to one brief.
Which office awarded N6247322F4883?
Navfac Southwest awarded N6247322F4883 to Ma Engineers Jv (potential $1.4M).
Who is the incumbent on N6247322F4883?
Ma Engineers Jv is the incumbent with $8.0M across 18 related awards in SCOUT’s public footprint. The current period of performance ends Oct 22, 2023.
When does Ma Engineers Jv’s N6247322F4883 come up for recompete?
SCOUT tracks a period-of-performance end of Oct 22, 2023. Actual solicitation timing can shift with extensions, bridges, or consolidations.
Data: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.
