PrimeRFP SCOUT · Federal Contract Recompete Brief

47PG0220F0030P-2 IS ISSUED to account for — Shekar Engineering, P.L.C

Shekar Engineering, P.L.C holds $8.9M across 48 federal awards, concentrated at Department of Defense (DOD). This PIID sits alongside 5 related awards under parent 47PG0019D0012. Competition previously drew 3 offers. Set-aside status: HZC. PoP ended Jul 14, 2023 — the usual 12–18 month planning window is closed; recompete action looks late or overdue.

Pbs R6
Awarding office
Shekar Engineering, P.L.C
Recipient
Jul 14, 2023
PoP end
$488K
Obligated
$1.6M
Potential
236220
NAICS
Z2AA
PSC
HZC
Set-aside
3 bidders on last award

Watch this recompete

One email. No account. We ping you if the window moves.

Score my position vs Shekar Engineering, P.L.C — $90

Contract facts

HZC
Contract number47PG0220F0030
Also listed as47PG02-20-F-0030
Also listed as47PG0019D0012-47PG0220F0030
AgencyPbs R6
Awarding officePbs R6
Awarding agencyGeneral Services Administration (GSA)
Funding agencyGeneral Services Administration (GSA)
IncumbentShekar Engineering, P.L.C
CAGE3LZW1
UEILZL3J61WVEY5
NAICS236220
PSCZ2AA
Parent IDIQ / IDV47PG0019D0012
Place of performanceLINCOLN NE
Pricing typeFirm Fixed Price
Extent competedFull And Open Competition After Exclusion Of Sources
Related solicitationRNE13046
PoP startApr 3, 2020
PoP end (current)Jul 14, 2023
PoP end (w/ options)Sep 12, 2023
Obligated$488K
Current value$1.6M
Potential value$1.6M

P-2 IS ISSUED TO ACCOUNT FOR ESCALATION RELATED TO THE PURCHASE OF SWITCHGEAR EQUIPMENT AND INSTALLATION AT A GSA APPROVED LOCATION. is a federal HZC award for Pbs R6 held by Shekar Engineering, P.L.C. Estimated value $1.6M ($488K obligated). Current period of performance ends Jul 14, 2023 (potential Sep 12, 2023). Last award drew 3 bidders. Place of performance: LINCOLN NE. Related solicitation RNE13046.

P-2 IS ISSUED TO ACCOUNT FOR ESCALATION RELATED TO THE PURCHASE OF SWITCHGEAR EQUIPMENT AND INSTALLATION AT A GSA APPROVED LOCATION.

Recompete timing

Public
Past PoP end (1134 days ago)

Current PoP ended Jul 14, 2023 (1134 days ago). The usual 12–18 month agency planning window is closed — recompete action looks late / overdue relative to a normal cycle. Watch for bridge orders, follow-ons, or a new solicitation.

Incumbent footprint

Public record

Shekar Engineering, P.L.C$8.9M obligated across 48 awards (firm-wide, all agencies) · lead buyer Department of Defense (DOD).

% of firm-wide obligated ($8.9M) · all agencies
Department of Defense (DOD)$3.4M · 38%General Services Administration (GSA)$2.9M · 33%Department of Agriculture (USDA)$2.6M · 29%
Open full company profile

Related awards

Same parent · incumbent
47PG0725F0015
GSA REDUNDANT HEAT EXCHANGER INSTALLATION AT HRUSKA COURTHOUSE, 111 S. 18TH PLAZA, OMAHA, …
$238K
Aug 28, 2026
FA460025F0117
DESIGN AND CONSTRUCTION OF A NEW RESTROOM IN THE DV LOUNGE RM N3.124, B1000
$283K
Sep 8, 2026
FA460025F0133
DESIGN-BUILD: REPAIR WATER LINE TAXIWAY CHARLIE
$1.7M
Sep 18, 2026
FA460025F0113
THIS REQUIREMENT IS TO RENOVATE B515 FOR THE 95TH WING IAW THE STATEMENT OF WORK.
$607K
Oct 15, 2026
12639526P0151
REPAIR HOOP BUILDINGS
$113K
May 31, 2027

Query this award live in SCOUT via MCP — personalized scoring, watchlists, and capture workflow across the corpus. Learn about SCOUT MCP

More in SCOUT
Size up the competition →Research the incumbent →

Frequently asked questions

What is contract 47PG0220F0030?

47PG0220F0030 (P-2 IS ISSUED to account for) is a Pbs R6 award with a potential value of $1.6M, currently held by Shekar Engineering, P.L.C. Figures are USASpending-sourced public-record facts plus SCOUT recompete analysis.

What is 47PG02-20-F-0030?

47PG02-20-F-0030 is the dashed form of PIID 47PG0220F0030 (P-2 IS ISSUED to account for), held by Shekar Engineering, P.L.C. Same award — SCOUT canonicalizes compact, dashed, and parent-child identifiers to one brief.

Which office awarded 47PG0220F0030?

Pbs R6 awarded 47PG0220F0030 to Shekar Engineering, P.L.C (potential $1.6M).

Who is the incumbent on 47PG0220F0030?

Shekar Engineering, P.L.C is the incumbent with $8.9M across 48 related awards in SCOUT’s public footprint. The current period of performance ends Jul 14, 2023.

When does Shekar Engineering, P.L.C’s 47PG0220F0030 come up for recompete?

SCOUT tracks a period-of-performance end of Jul 14, 2023. Actual solicitation timing can shift with extensions, bridges, or consolidations.

Data: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.

Data as of · refreshed monthlyLatest procurement action
Sources: USASpending, FPDS, SAM.gov · Public-record facts + SCOUT analysis shown above; personalized scoring in SCOUT.
primerfp.com/intel/contract/47PG0220F0030