Contract facts
FederalDESIGN - LOCH RAVEN BOILER REPLACEMENT - NCTE is a federal award for 245-Network Contract Office 5 (36C245) held by Veteran Design & Construction, Inc. Estimated value $240K ($617.1 obligated). Current period of performance ends May 30, 2025. Last award drew 1 bidder. Place of performance: CATONSVILLE MD.
DESIGN - LOCH RAVEN BOILER REPLACEMENT - NCTE
Recompete timing
PublicCurrent PoP ended May 30, 2025 (448 days ago). The usual 12–18 month agency planning window is closed — recompete action looks late / overdue relative to a normal cycle. Watch for bridge orders, follow-ons, or a new solicitation.
Incumbent footprint
Public recordVeteran Design & Construction, Inc — $28.1M obligated across 44 awards (firm-wide, all agencies) · lead buyer Department of Veterans Affairs (VA).
Related awards
Same parent · incumbentQuery this award live in SCOUT via MCP — personalized scoring, watchlists, and capture workflow across the corpus. Learn about SCOUT MCP →
Frequently asked questions
What is contract 36C24519N0630?
36C24519N0630 (DESIGN - LOCH RAVEN BOILER replacement) is a 245-Network Contract Office 5 (36C245) award with a potential value of $240K, currently held by Veteran Design & Construction, Inc. Figures are USASpending-sourced public-record facts plus SCOUT recompete analysis.
What is 36C245-19-N-0630?
36C245-19-N-0630 is the dashed form of PIID 36C24519N0630 (DESIGN - LOCH RAVEN BOILER replacement), held by Veteran Design & Construction, Inc. Same award — SCOUT canonicalizes compact, dashed, and parent-child identifiers to one brief.
Which office awarded 36C24519N0630?
245-Network Contract Office 5 (36C245) awarded 36C24519N0630 to Veteran Design & Construction, Inc (potential $240K).
Who is the incumbent on 36C24519N0630?
Veteran Design & Construction, Inc is the incumbent with $28.1M across 44 related awards in SCOUT’s public footprint. The current period of performance ends May 30, 2025.
When does Veteran Design & Construction, Inc’s 36C24519N0630 come up for recompete?
SCOUT tracks a period-of-performance end of May 30, 2025. Actual solicitation timing can shift with extensions, bridges, or consolidations.
Data: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.
