Contract facts
Small businessNo full NAICS 238220 intel page yet. Browse NAICS intelligence
REPLACE EXISTING CHILLERS, REFURBISH COOLING TOWERS, REPLACE PRIMARY/SECONDARY CHILLED WATER PUMPS, CONDENSER WATER PUMPS, RELATED PIPING/CONTROLS, AND PRESSURE DIFFERENTIAL DELTA P VALVES WITH EXISTING JOHNSON CONTROLS METASYS SYSTEM. is a federal Small business award for W075 Endist Los Angeles held by Mik Construction Inc. Estimated value $16M ($16M obligated). Current period of performance ends Apr 12, 2027. Last award drew 5 bidders. Place of performance: LONG BEACH CA.
REPLACE EXISTING CHILLERS, REFURBISH COOLING TOWERS, REPLACE PRIMARY/SECONDARY CHILLED WATER PUMPS, CONDENSER WATER PUMPS, RELATED PIPING/CONTROLS, AND PRESSURE DIFFERENTIAL DELTA P VALVES WITH EXISTING JOHNSON CONTROLS METASYS SYSTEM.
Recompete timing
PublicCurrent PoP ends Apr 12, 2027 (197 days remaining). Agencies typically plan 12–18 months ahead — at 6.5 months out, that window is already open. The buying decision is likely already in motion.
Want the durability read on W912PL25CA009? One Pursuit Analysis, $500, inside 48 business hours.
- 48 business hours
- $500
- Credits toward the Pack
Incumbent footprint
Public recordMik Construction Inc — $49.3M obligated across 49 awards (firm-wide, all agencies) · lead buyer Department of Defense (DOD).
Query this award live in SCOUT via MCP — personalized scoring, watchlists, and capture workflow across the corpus. Learn about SCOUT MCP →
Frequently asked questions
What is contract W912PL25CA009?
W912PL25CA009 (Replace existing chillers refurbish cooling) is a W075 Endist Los Angeles award with a potential value of $16M, currently held by Mik Construction Inc. Figures are USASpending-sourced public-record facts plus SCOUT recompete analysis.
Which office awarded W912PL25CA009?
W075 Endist Los Angeles awarded W912PL25CA009 to Mik Construction Inc (potential $16M).
Who is the incumbent on W912PL25CA009?
Mik Construction Inc is the incumbent with $49.3M across 49 related awards in SCOUT’s public footprint. The current period of performance ends Apr 12, 2027.
When does Mik Construction Inc’s W912PL25CA009 come up for recompete?
SCOUT tracks a period-of-performance end of Apr 12, 2027. Actual solicitation timing can shift with extensions, bridges, or consolidations.
Want the durability read on W912PL25CA009? One Pursuit Analysis, $500, inside 48 business hours.
One Pursuit Analysis is $500 and credits toward the Sprint Pack. Delivery is 48 business hours. Start with the free Exposure Check if you want the list first.
No card · under a minute · then the Sprint menu
Buy one Pursuit Analysis — $500Credits toward the Sprint Pack
Compare plansData: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.