Family facts
IDVParent PIIDW9123821D0003
Also listed asW91238-21-D-0003
AgencyUs Army Engineer District Sacrament
Awarding officeUs Army Engineer District Sacrament
Awarding agencyDepartment of Defense (DOD)
Period endJul 10, 2029
IDV obligated$27.1M
Child awards11
Bonuses end Sept 30
Want the durability read on W9123821D0003? One Pursuit Analysis, $500, inside 48 business hours.
- 48 business hours
- $500
- Credits toward the Pack
Places of performance
StatesCA
Distinctive task orders
11W9123823F0015 — PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES (ARCF) 2016 PROJECT, CIVIL AND FISH PASSAGE ENGINEERING DURI…
Hdr Gei Joint Venture · $6.5M · PoP Mar 31, 2028
W9123824F0047 — PROJECT TITLE AND LOCATION: PROGRAMMATIC BASELINE WATER CONTROL MANUAL (WCM) UPDATES FOR BLACK BUTTE DAM, HIDDEN DAM, N…
Hdr Gei Joint Venture · $4.6M · PoP Sep 27, 2026
W9123825F0080 — PROJECT TITLE AND LOCATION: SAN JOAQUIN RIVER BASIN, LOWER SAN JOAQUIN RIVER, FOURTEEN MILE SLOUGH CLOSURE STRUCTURE (F…
Hdr Gei Joint Venture · $4.0M · PoP Jul 7, 2027
W9123824F0004 — PROJECT TITLE AND LOCATION: MITIGATION DESIGN OF THE URRUTIA HABITAT RESTORATION AND ENHANCEMENT PROJECT ON THE LOWER A…
Hdr Gei Joint Venture · $3.7M · PoP May 31, 2027
W9123825FA043 — WATER CONTROL MANUAL (WCM) UPDATES FOR OROVILLE DAM, OROVILLE, CA AND NEW BULLARDS BAR DAM, DOBBINS, CA FY25
Hdr Gei Joint Venture · $2.0M · PoP Nov 27, 2027
W912P722F0005 — DESIGN OF IRRIGATION SYSTEM FOR GOLDEN GATE NATIONAL CEMETERY
Hdr Gei Joint Venture · $1.8M · PoP Mar 13, 2026
W9123824F0002 — PROJECT TITLE AND LOCATION: CROSSOVER AND RUN-AROUND TRACKS, MILITARY OCEAN TERMINAL CONCORD (MOTCO), CONCORD, CA
Hdr Gei Joint Venture · $1.4M · PoP Nov 30, 2027
W9123823F0060 — PROJECT TITLE: PREPARATION OF WATER CONTROL MANUAL UPDATE MANAGEMENT PLANS FOR MULTIPLE DAMS TRUCKEE RIVER BASIN RESERV…
Hdr Gei Joint Venture · $1.3M · PoP Oct 31, 2025
W912P723F0030 — GOLDEN GATE NATIONAL CEMETERY ROAD IMPROVEMENT DESIGN
Hdr Gei Joint Venture · $858K · PoP Aug 15, 2025
W9123825FA010 — PROJECT TITLE AND LOCATION: FOLSOM DAM RAISE PROJECT, MAIN DAM SPILLWAY EDC, FOLSOM, CALIFORNIA
Hdr Gei Joint Venture · $264K · PoP Jul 10, 2029
W9123822F0004 — PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH A, CIVIL ENGINEERING SERVICES DURING CO…
Hdr Gei Joint Venture · $1.0M · PoP May 31, 2027
Want the durability read on W9123821D0003? One Pursuit Analysis, $500, inside 48 business hours.
One Pursuit Analysis is $500 and credits toward the Sprint Pack. Delivery is 48 business hours. Start with the free Exposure Check if you want the list first.
Get the free Exposure Check
No card · under a minute · then the Sprint menu
Buy one Pursuit Analysis — $500Credits toward the Sprint Pack
Compare plansData: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.
Data as of · refreshed monthly