Contract facts
NONETHIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. is a federal NONE award for Nasa Goddard Space Flight Center held by Trustees of Princeton University, the. Estimated value $12.1M ($5.8M obligated). Current period of performance ends Sep 30, 2026. Last award drew 3 bidders. Place of performance: PRINCETON NJ.
THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.
Recompete timing
PublicCurrent PoP ends Sep 30, 2026 (23 days remaining). Agencies typically plan 12–18 months ahead — at 0.8 months out, that window is already open. The buying decision is likely already in motion.
Incumbent footprint
Public recordTrustees of Princeton University, the — $617.9M obligated across 10 awards (firm-wide, all agencies) · lead buyer Department of Energy (DOE).
Related awards
Same incumbentQuery this award live in SCOUT via MCP — personalized scoring, watchlists, and capture workflow across the corpus. Learn about SCOUT MCP →
Frequently asked questions
What is contract NNG17FC93C?
NNG17FC93C (IBEX IBEX THIS contract IS) is a Nasa Goddard Space Flight Center award with a potential value of $12.1M, currently held by Trustees of Princeton University, the. Figures are USASpending-sourced public-record facts plus SCOUT recompete analysis.
Which office awarded NNG17FC93C?
Nasa Goddard Space Flight Center awarded NNG17FC93C to Trustees of Princeton University, the (potential $12.1M).
Who is the incumbent on NNG17FC93C?
Trustees of Princeton University, the is the incumbent with $617.9M across 10 related awards in SCOUT’s public footprint. The current period of performance ends Sep 30, 2026.
When does Trustees of Princeton University, the’s NNG17FC93C come up for recompete?
SCOUT tracks a period-of-performance end of Sep 30, 2026. Actual solicitation timing can shift with extensions, bridges, or consolidations.
Seen enough? Run one full capture cycle on NNG17FC93C — $90 for 90 days.
This page stays free. Pilot is the live layer: displacement scoring, recompete pipeline, Daily Brief, and SCOUT MCP for 90 days. If you already live in Claude or ChatGPT and only need live search, start MCP Explorer at $29/mo.
$1/day · one payment · no subscription
Use SCOUT in your AI client — $29/moClassify + search inside Claude, ChatGPT, Cursor
Compare plansData: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.