Contract facts
FederalMODIFICATION TO INCLUDE RISK CATEGORY IV PER UFC 3-301-01, AND CONCRETE STEPS AND RAILINGS FOR ARCHITECT ENGINEER SERVICE PROJECT WR741224-N6247816D5026-B479 INSTALL GENERATOR AND FUEL TANK, JOINT BASE PEARL HARBOR HICKAM. is a federal award for Navfac Engineering Command Hawaii held by Mk Engineers, Ltd. Estimated value $531K ($26K obligated). Current period of performance ends Aug 15, 2024. Place of performance: MILILANI HI.
MODIFICATION TO INCLUDE RISK CATEGORY IV PER UFC 3-301-01, AND CONCRETE STEPS AND RAILINGS FOR ARCHITECT ENGINEER SERVICE PROJECT WR741224-N6247816D5026-B479 INSTALL GENERATOR AND FUEL TANK, JOINT BASE PEARL HARBOR HICKAM.
Recompete timing
PublicCurrent PoP ended Aug 15, 2024 (736 days ago). The usual 12–18 month agency planning window is closed — recompete action looks late / overdue relative to a normal cycle. Watch for bridge orders, follow-ons, or a new solicitation.
Incumbent footprint
Public recordMk Engineers, Ltd — $6.9M obligated across 23 awards (firm-wide, all agencies).
Related awards
Same parent · incumbentQuery this award live in SCOUT via MCP — personalized scoring, watchlists, and capture workflow across the corpus. Learn about SCOUT MCP →
Frequently asked questions
What is contract N6247820F4257?
N6247820F4257 (Modification to include RISK category IV) is a Navfac Engineering Command Hawaii award with a potential value of $531K, currently held by Mk Engineers, Ltd. Figures are USASpending-sourced public-record facts plus SCOUT recompete analysis.
What is N62478-20-F-4257?
N62478-20-F-4257 is the dashed form of PIID N6247820F4257 (Modification to include RISK category IV), held by Mk Engineers, Ltd. Same award — SCOUT canonicalizes compact, dashed, and parent-child identifiers to one brief.
Which office awarded N6247820F4257?
Navfac Engineering Command Hawaii awarded N6247820F4257 to Mk Engineers, Ltd (potential $531K).
Who is the incumbent on N6247820F4257?
Mk Engineers, Ltd is the incumbent with $6.9M across 23 related awards in SCOUT’s public footprint. The current period of performance ends Aug 15, 2024.
When does Mk Engineers, Ltd’s N6247820F4257 come up for recompete?
SCOUT tracks a period-of-performance end of Aug 15, 2024. Actual solicitation timing can shift with extensions, bridges, or consolidations.
Data: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.
