Family facts
IDVParent PIIDDTFAAC16D00015
Agency6973gh Franchise Acquisition Svcs
Awarding office6973gh Franchise Acquisition Svcs
Awarding agencyDepartment of Transportation (DOT)
Period endFeb 5, 2023
IDV obligated$828K
Child awards15
Bonuses end Sept 30
Want the durability read on DTFAAC16D00015? One Pursuit Analysis, $500, inside 48 business hours.
- 48 business hours
- $500
- Credits toward the Pack
Places of performance
StatesCA, FL, IN, KY, OK
Distinctive task orders
126973GH18F00455 — SITE SURVEY AND DESIGN FOR MCO ATCT CPDS
Quad J Inc. · $2.6M · PoP Oct 11, 2022
6973GH18F01891 — CONDUCT FST SITE SURVEYS AND FST INSTALLATIONS AT VARIOUS LOCATIONS.
Quad J Inc. · $479K · PoP Sep 14, 2022
6973GH18F00927 — OAKLAND, CA (OAKG) SX JCN:1105973 - DESIGN SITE SURVEY FOR EG REPLACEMENT
Quad J Inc. · $424K · PoP Dec 31, 2021
6973GH19F01385 — CHANGE ORDER FOR REMOTE LOGISTICS, MOBILIZATION/DE-MOBILIZATION, TEMP TANK RENTAL, REMOVAL OF TWO 2,000 GAL ASTS, SOIL…
Quad J Inc. · $320K · PoP Aug 9, 2022
6973GH19F01767 — GREAT LAKES GROUP SITE SURVEY AND DESIGN FOR EG REPLACEMENT / MULTIPLE LOCATIONS
Quad J Inc. · $289K · PoP Oct 7, 2021
6973GH19F01509 — CHANGE ORDER FOR INCREASED LODGING AND MI&E DAYS, INCREASED MATERIALS COSTS, REMOVAL/RECYCLING OF EXISTING TANK, CONCRE…
Quad J Inc. · $235K · PoP Jul 19, 2022
6973GH20F01267 — CHANGE ORDER TO INSTALL A GFE DAY TANK AT POINT REYES, CA (PYE TANK) JCN: 1502296
Quad J Inc. · $234K · PoP Dec 12, 2022
6973GH20F01268 — CHANGE ORDER FOR COST INCREASE OF 500 GAL DIESEL FST AT UKIAH, CA (UKI) RCAG JCN: 18027624
Quad J Inc. · $232K · PoP Jan 22, 2023
6973GH20F01264 — CHANGE ORDER FOR COST INCREASES FOR MATERIALS AND SHIPPING FOR A DIESEL FST AT MILL VALLEY, CA (QMV) ARSR, JCN: 1502376
Quad J Inc. · $229K · PoP Feb 5, 2023
6973GH18F01630 — CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND ATTACHED SOW.
Quad J Inc. · $218K · PoP Sep 6, 2022
6973GH19F01518 — CHANGE ORDER FOR ADDITIONAL REQUIREMENTS ABOVE THE BASELINE INCLUDING DEMOLITION AND INSTALLATION OF AST SUPPORT PAD AT…
Quad J Inc. · $201K · PoP Sep 6, 2022
6973GH19F01375 — CHANGE ORDER FOR FST PIPING UPGRADE TO THE EG SYSTEM AT LEXINGTON, KY (LEXB TANK) JCN#: 1503330
Quad J Inc. · $148K · PoP Dec 8, 2022
Want the durability read on DTFAAC16D00015? One Pursuit Analysis, $500, inside 48 business hours.
One Pursuit Analysis is $500 and credits toward the Sprint Pack. Delivery is 48 business hours. Start with the free Exposure Check if you want the list first.
Get the free Exposure Check
No card · under a minute · then the Sprint menu
Buy one Pursuit Analysis — $500Credits toward the Sprint Pack
Compare plansData: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.
Data as of · refreshed monthly