Family facts
IDVParent PIID80KSC022DA121
AgencyNasa Kennedy Space Center
Awarding officeNasa Kennedy Space Center
Awarding agencyNational Aeronautics and Space Administration (NASA)
Period endDec 27, 2028
IDV obligated$7.7M
Child awards18
Bonuses end Sept 30
Want the durability read on 80KSC022DA121? One Pursuit Analysis, $500, inside 48 business hours.
- 48 business hours
- $500
- Credits toward the Pack
Places of performance
StatesAL, FL, MS
Distinctive task orders
1280KSC023FA178 — SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 993…
Nelson Engineering Co. · $1.3M · PoP Dec 27, 2028
80MSFC23FA022 — TASK ORDER FOR MARSHALL SPACE FLIGHT CENTER RELIABILITY CENTER MAINTENANCE ENGINEERING PHASE II UNDER THE SOUTH EASTERN…
Nelson Engineering Co. · $1.1M · PoP Mar 31, 2024
80KSC024FA094 — ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF),…
Nelson Engineering Co. · $1.1M · PoP Dec 25, 2026
80SSC024FA023 — ARCHITECT-ENGINEER SERVICES FOR THE DEVELOPMENT OF A DESIGN PACKAGE (DESIGN-BID-BUILD) FOR THE REFURBISHMENT OF THE BAS…
Nelson Engineering Co. · $517K · PoP Aug 8, 2025
80KSC025FA015 — SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO DO A PUMP HOUSE ALTERNATIVES STUDY AT THE ROTATION, PROCESS…
Nelson Engineering Co. · $507K · PoP May 29, 2026
80KSC025FA010 — ARCHITECT-ENGINEER SERVICES, DESIGN LOW VOLTAGE UPGRADES BOOSTER FABRICATION FACILITY: PROJECT CONTROL NUMBER: 99604
Nelson Engineering Co. · $409K · PoP Dec 22, 2025
80MSFC24FA112 — TASK ORDER 80MSFC24FA112 MSFC REVITALIZE ELECTRICAL SYSTEMS BUILDING 4583 BASE AWARD
Nelson Engineering Co. · $399K · PoP Jul 18, 2025
80KSC022FA084 — THE REVISION OF UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) VARIOUS DISCIPLINES AT THE KENNEDY SPACE CENTER (KSC), FLO…
Nelson Engineering Co. · $291K · PoP Sep 11, 2023
80MSFC24FA083 — TASK ORDER 80MSFC24FA083 COMPRESSOR STUDIES BASE AND OPTION 1 BASE AWARD
Nelson Engineering Co. · $282K · PoP Dec 12, 2024
80KSC023FA155 — ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE…
Nelson Engineering Co. · $229K · PoP Apr 30, 2026
80KSC023FA140 — STUDY OF UPGRADE OPERATIONS AND CHECKOUT BUILDING SOUTH WING MECHANICAL SYSTEMS
Nelson Engineering Co. · $173K · PoP Mar 1, 2024
80KSC024FA013 — DESIGN REFRESH OF SAFE AND RELIABILITY ELECTRICAL UPGRADES, PHASES 5 & 6.
Nelson Engineering Co. · $155K · PoP Jul 31, 2024
Want the durability read on 80KSC022DA121? One Pursuit Analysis, $500, inside 48 business hours.
One Pursuit Analysis is $500 and credits toward the Sprint Pack. Delivery is 48 business hours. Start with the free Exposure Check if you want the list first.
Get the free Exposure Check
No card · under a minute · then the Sprint menu
Buy one Pursuit Analysis — $500Credits toward the Sprint Pack
Compare plansData: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.
Data as of · refreshed monthly