Family facts
IDVParent PIID80KSC019D0012
Also listed as80KSC0-19-D-0012
AgencyNasa Kennedy Space Center
Awarding officeNasa Kennedy Space Center
Awarding agencyNational Aeronautics and Space Administration (NASA)
Period endSep 30, 2026
IDV obligated$7.4M
Child awards13
Bonuses end Sept 30
Want the durability read on 80KSC019D0012? One Pursuit Analysis, $500, inside 48 business hours.
- 48 business hours
- $500
- Credits toward the Pack
Places of performance
StatesFL, VA
Distinctive task orders
1280KSC019F0224 — SOIL INTERIM MEASURES AT VARIOUS SITES. INCORPORATES TECHNICAL DIRECTIVE 2 FOR $691,768.00.
Hydrogeologic, Inc. · $2.8M · PoP Sep 30, 2026
80KSC021F0168 — PERFLUOROALKYL (PER)- AND POLYFLUOROALKYL SUBSTANCES SITE ASSESSMENT AND MITIGATION AT KENNEDY SPACE CENTER, FLORIDA
Hydrogeologic, Inc. · $1.9M · PoP Jun 30, 2026
80KSC019F0118 — SOLID WASTE MANAGEMENT UNIT (SWMU) ASSESSMENTS, CONFIRMATION SAMPLING WORK PLANS (CSWP), AND CONFIRMATION. INCORPORATES…
Hydrogeologic, Inc. · $1.1M · PoP Jun 30, 2026
80KSC019F0096 — GROUNDWATER INTERIM MEASURES AND MONITORING AT CONTRACTORS ROAD HEAVY EQUIPMENT AREA (CRHEA). MOD 3 INCORPORATES TD#3,…
Hydrogeologic, Inc. · $1.1M · PoP Jun 30, 2026
80KSC019F0090 — GROUNDWATER MONITORING AT THE FLUID SERVICING ROAD AREA LONG TERM MONITORING (LTM) PROGRAM KENNEDY SPACE CENTER. INCORP…
Hydrogeologic, Inc. · $731K · PoP Jun 30, 2026
80KSC021F0097 — ENGINEERING EVALUATION ACTIVITIES AT THE COMMUNICATIONS, MAINTENANCE AND STORAGE FACILITY. SOLID WASTE MANAGEMENT UNIT…
Hydrogeologic, Inc. · $671K · PoP Jun 30, 2026
80KSC022F0024 — AIR SPARGE SYSTEM ABANDONMENT AT VERTICAL PROCESSING FACILITY
Hydrogeologic, Inc. · $374K · PoP Dec 30, 2024
80KSC019F0088 — INSTALLATION AND ABANDONMENT OF MONITORING WELLS AT VARIOUS SITES, KENNEDY SPACE CENTER, FLORIDA MOD 1: INCORPORATE TEC…
Hydrogeologic, Inc. · $323K · PoP Dec 31, 2024
80LARC23F0027 — PROFESSIONAL ENVIRONMENTAL REMEDIATION SERVICES TO INVESTIGATE, DESIGN, AND IMPLEMENT REMEDIAL ACTIONS AT LANGLEY RESEA…
Hydrogeologic, Inc. · $319K · PoP May 30, 2025
80KSC019F0087 — INTERIM MEASURE ACTIVITIES AT C-5 ELECTRICAL SUBSTATION, KENNEDY SPACE CENTER, FLORIDA. MOD 3: INCORPORATE TECHNICAL DI…
Hydrogeologic, Inc. · $313K · PoP Dec 30, 2024
80KSC019F0128 — REMEDIATION TEAM MEETINGS AT KENNEDY SPACE CENTER, FLORIDA. MOD 5: INCORPORATES TECHNICAL DIRECTIVE (TD)-4. FUNDING AND…
Hydrogeologic, Inc. · $152K · PoP Jun 30, 2025
80KSC023F0016 — GROUNDWATER INTERIM MEASURES AT THE PROPELLANTS SUPPORT BUILDING AREA, KENNEDY SPACE CENTER, FLORIDA
Hydrogeologic, Inc. · $114K · PoP Jun 30, 2026
Want the durability read on 80KSC019D0012? One Pursuit Analysis, $500, inside 48 business hours.
One Pursuit Analysis is $500 and credits toward the Sprint Pack. Delivery is 48 business hours. Start with the free Exposure Check if you want the list first.
Get the free Exposure Check
No card · under a minute · then the Sprint menu
Buy one Pursuit Analysis — $500Credits toward the Sprint Pack
Compare plansData: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.
Data as of · refreshed monthly