Family facts
IDVParent PIID6973GH22D00007
Agency6973gh Franchise Acquisition Svcs
Awarding office6973gh Franchise Acquisition Svcs
Awarding agencyDepartment of Transportation (DOT)
Period endMar 2, 2027
IDV obligated$17.8M
Child awards66
Bonuses end Sept 30
Want the durability read on 6973GH22D00007? One Pursuit Analysis, $500, inside 48 business hours.
- 48 business hours
- $500
- Credits toward the Pack
Places of performance
StatesAL, AR, CO, HI, IA, ID, KS, LA, MA, MD, MN, MO
Distinctive task orders
126973GH25F01106 — IIJA FUNDS. SITE SPECIFIC INSTALLATION COST FOR EG AND FST REPLACEMENT, ERMS INSTALLATION AND FULL POWER SYSTEM STUDY A…
Barry Williams Electric Inc. · $822K · PoP Oct 31, 2026
6973GH23F01839 — BIL FUNDING, FST SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT FOR LUBBOCK, TX (…
Barry Williams Electric Inc. · $698K · PoP Jun 30, 2026
6973GH22F01699 — BIL FUNDING FOR SITE SURVEY, DESIGN, EG INSTALLATION AND LPGBS AT ALBUQUERQUE, NM (ABQF) ASR JCN:22002452 / LPGBS BIL J…
Barry Williams Electric Inc. · $580K · PoP Mar 31, 2026
6973GH23F01841 — BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT FOR SALINA, KS (SL…
Barry Williams Electric Inc. · $543K · PoP Oct 31, 2026
6973GH26F00257 — REPLACE THE EXISTING ENGINE GENERATOR (EG) WITH A KOHLER 40KW PROPANE EG, INSTALL THE ERMS WIRING, UPDATE THE EXISTING…
Barry Williams Electric Inc. · $439K · PoP Oct 31, 2026
6973GH22F00959 — INSTALLATION FUNDING FOR THE EG, ERMS, AND FST REPLACEMENT PROJECT AT THE GXY ASR LOCATED IN GREELEY, CO
Barry Williams Electric Inc. · $410K · PoP Oct 7, 2023
6973GH24F01189 — 2024 OUTDOOR EG BASELINE SITE SURVEY, DESIGN AND INSTALL FUNDING FOR SAN ANTONIO, TX (ANTA) LOC JCN: 22001117
Barry Williams Electric Inc. · $398K · PoP Sep 30, 2026
6973GH26F00542 — IIJA FUNDS. EG INSTALL, FULL POWER SYSTEM STUDY AND ERMS FUNDING AT CHELSEA, OK (QAF) ATCBI JCN:23007870
Barry Williams Electric Inc. · $398K · PoP Mar 2, 2027
6973GH23F01641 — ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT SYRACUSE, NY (SYRD) ALS JCN: 18028253
Barry Williams Electric Inc. · $375K · PoP Aug 17, 2026
6973GH23F01840 — BIL FUNDING FOR FST SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT FOR MIDLAND, T…
Barry Williams Electric Inc. · $356K · PoP Mar 31, 2026
6973GH23F00090 — BIL: CONDUCT SITE VISIT (TRAVEL AND SITE SURVEY REPORT), DESIGN, AND FST INSTALLATION AT BYHALIA, MS (QYB) ARSR. JCN: 1…
Barry Williams Electric Inc. · $328K · PoP Oct 31, 2024
6973GH25F01432 — TO FUND THE FUEL STORAGE TANK (FST) REPLACEMENT AT LCH ASR.
Barry Williams Electric Inc. · $312K · PoP May 31, 2026
Want the durability read on 6973GH22D00007? One Pursuit Analysis, $500, inside 48 business hours.
One Pursuit Analysis is $500 and credits toward the Sprint Pack. Delivery is 48 business hours. Start with the free Exposure Check if you want the list first.
Get the free Exposure Check
No card · under a minute · then the Sprint menu
Buy one Pursuit Analysis — $500Credits toward the Sprint Pack
Compare plansData: Showing contracts ≥ $100K from federal procurement records (FPDS-NG, SAM.gov, and related repositories), normalized by PrimeRFP SCOUT. Each row keyed by Award ID (PIID); task orders appear as independent rows.
Data as of · refreshed monthly