🏆 Featured Contract of the Day

Submission Deadline: 2025-02-04

Source: Co-op

Type: Bid Notification

Set Aside:: N/A

Galveston County WCID #1 - FM 517 West 16-Inch Water Line

The Galveston County Water Control and Improvement District No. 1 (District) is soliciting bids for the construction of approximately 4,600 linear feet of 16-inch water line along the south side of FM 517, from FM 646 to Medical Park Drive in Dickinson, Texas. The project includes installing new gate valves, fire hydrants, water service and vault reconnections, abandoning an existing 10-inch water line, installing three new 6-inch sanitary service lines across FM 517, abandoning an existing 8-inch sanitary sewer line between Hansen Drive and Evergreen Drive, and performing necessary pavement, driveway, and sidewalk repairs to complete the construction.

Key Dates
- Pre-Bid Meeting: January 16, 2025, at 10:00 AM
- Bid Submission Deadline: February 4, 2025, at 10:00 AM

Key Contact
- Name: Ryan Nokelby
- Email: Ryan.Nokelby@hdrinc.com

Scope of Work:
- Construct approximately 4,600 linear feet of 16-inch water line within a District easement along FM 517.
- Install new gate valves and fire hydrants.
- Reconnect water services and vaults.
- Abandon existing 10-inch water line within the easement.
- Install three new 6-inch sanitary service lines across FM 517.
- Abandon existing 8-inch sanitary sewer line between Hansen Drive and Evergreen Drive.
- Perform miscellaneous pavement, driveway, and sidewalk repairs as required.

Bid Submission:
- Bids must be submitted electronically through the CIVCAST platform.
- Ensure all required documents and forms are completed and uploaded as specified in the bid instructions.

Pre-Bid Meeting:
- Attendance at the pre-bid meeting is recommended to understand project specifics and ask questions.

Compliance:
- Adhere to all local, state, and federal regulations applicable to the project.
- Ensure all work meets the District's standards and specifications.

Talk to Our Team

See how SCOUT's intelligence and preparation tools fit your pipeline.